Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0037 # 05 Y:2023 | 05 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $104,339 | $0 | Implemented |
MU0037 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $65,091 | $242,014 | Implemented |
MU0037 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,719 | $180 | Implemented |
MU0032 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36 | $126 | Implemented |
MU0032 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $465 | $0 | Implemented |
MU0025 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,096 | $0 | Implemented |
MU0025 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,630 | $360 | Implemented |
MU0025 # 09 Y:2023 | 09 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,952 | $19,852 | Implemented |
MU0025 # 08 Y:2023 | 08 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $431 | $0 | Implemented |
MU0025 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,434 | $2,876 | Implemented |
MU0025 # 06 Y:2023 | 06 | 2023 | USE OPTIMUM TEMPERATURE | $1,361 | $0 | Implemented |
MU0025 # 04 Y:2023 | 04 | 2023 | KEEP EQUIPMENT CLEAN | $332 | $0 | Implemented |
MU0025 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $37 | $50 | Implemented |
UD1015 # 07 Y:2020 | 07 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,591 | $0 | Implemented |
UD1015 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,207 | $0 | Implemented |
UD1015 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,267 | $0 | Implemented |
UM0461 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $2,000 | Implemented |
UM0461 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,928 | $1,000 | Implemented |
UM0427 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,680 | $9,000 | Implemented |
UM0427 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,906 | $6,500 | Implemented |
UM0411 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $821 | $100 | Implemented |
UM0394 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $1,971 | $2,584 | Implemented |
UM0394 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,147 | $200 | Implemented |
UM0392 # 08 Y:2011 | 08 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $630 | $1,000 | Implemented |
UM0392 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,168 | $54,459 | Implemented |