IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0239 # 03 Y:2024 03 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $9,905 $9,905 Implemented
UU0239 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $6,144 $7,887 Implemented
UU0239 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,184 $8,000 Implemented
UU0239 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $18,178 $2,000 Implemented
UU0229 # 03 Y:2023 03 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $4,945 $3,480 Implemented
UU0229 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $2,146 $3,060 Implemented
UU0229 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,527 $5,600 Implemented
UU0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $277 $142 Implemented
UU0223 # 01 Y:2023 01 2023 ELIMINATE SHIFT $171,281 $5,500 Implemented
UU0223 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,735 $51,600 Implemented
UU0223 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,766 $26,767 Implemented
UU0223 # 04 Y:2023 04 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $3,305 $11,743 Implemented
UU0217 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,807 $8,910 Implemented
UU0217 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,013 $1,020 Implemented
UU0217 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,500 $51,330 Implemented
UU0217 # 01 Y:2023 01 2023 Install Anaerobic Digester $648,030 $7,400,000 Implemented
UU0187 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $735 $1,470 Implemented
UU0180 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $776 $126 Implemented
UU0180 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,182 $4,000 Implemented
UU0180 # 09 Y:2021 09 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $323 $227 Implemented
UU0180 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,073 $13,873 Implemented
UU0179 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,131 $100 Implemented
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,935 $2,000 Implemented
UU0161 # 01 Y:2020 01 2020 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $43,260 $86,000 Implemented