IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0417 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,845 $0 Implemented
MI0417 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,839 $2,140 Implemented
UA0267 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,033 $1,000 Implemented
UA0267 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $677 $901 Implemented
UA0267 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,954 $1,360 Implemented
IP0166 # 10 Y:2022 10 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $279 $665 Implemented
IP0166 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $526 $33 Implemented
IP0166 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,623 $0 Implemented
IP0166 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $416 Implemented
IP0166 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $1,162 Implemented
IP0166 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,625 $3,274 Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0166 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $665 Implemented
AS0534 # 01 Y:2022 01 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $20,000 $450 Implemented
AS0534 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,218 $1,951 Implemented
MI0415 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,767 $960 Implemented
NL0075 # 01 Y:2022 01 2022 AIR CONDITION ONLY SPACE NECESSARY $13,412 $7,500 Implemented
NL0075 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,652 Implemented
NL0075 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $980 $404 Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
UW2209 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,845 $6,616 Implemented
UW2209 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,907 $2,080 Implemented