IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2402 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $5,000 $12,500 Implemented
LS2402 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,573 $125 Implemented
LS2402 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $35,595 $0 Implemented
LS2401 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $180 Implemented
LS2401 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $100 Implemented
LS2401 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,301 $100 Implemented
LS2401 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $370 $75 Implemented
LS2401 # 05 Y:2024 05 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $452,959 $1,680,000 Implemented
LS2401 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,633 $42,000 Implemented
UU0235 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,013 Implemented
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 Implemented
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 Implemented
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 Implemented
IC0294 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,276 $1,797 Implemented
IC0294 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $979 $608 Implemented
IC0294 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,597 $3,641 Implemented
UU0239 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,184 $8,000 Implemented
UU0239 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $18,178 $2,000 Implemented
UU0239 # 03 Y:2024 03 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $9,905 $9,905 Implemented
UU0239 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $6,144 $7,887 Implemented
UD1070 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $5,413 $1,000 Implemented
UD1070 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,179 $2,000 Implemented
SF0610 # 03 Y:2024 03 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $32,003 $15,909 Implemented
SF0610 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $12,954 $0 Implemented