IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0786 # 06 Y:2018 06 2018 INSTALL TIMERS AND/OR THERMOSTATS $559 $360 Implemented
MA0786 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,650 $11,256 Not Implemented
MA0786 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $10,389 $13,527 Not Implemented
MA0786 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,232 $1,000 Implemented
MA0786 # 04 Y:2018 04 2018 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,126 $500 Not Implemented
MA0786 # 05 Y:2018 05 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $542 $1,820 Not Implemented
MA0575 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $68,834 $23,508 Implemented
MA0575 # 02 Y:2005 02 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,800 $41,620 Implemented
MA0575 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $517 Implemented
MA0575 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,944 $7,285 Implemented
MA0575 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $0 Not Implemented
MA0575 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $512 $195 Not Implemented
MA0575 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $233 $30 Not Implemented
MA0458 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,269 $64,000 Not Implemented
MA0458 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,885 $6,215 Implemented
MA0458 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $1,161 $600 Implemented
MA0458 # 04 Y:2000 04 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $963 $400 Implemented
MA0458 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $757 $1,000 Implemented
MA0422 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,889 $3,625 Not Implemented
MA0422 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $776 Implemented
MA0422 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $337 $346 Implemented
MA0422 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $452 $1,270 Implemented
MA0422 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $764 $0 Implemented
MA0422 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,664 $120,000 Not Implemented
ME0253 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,662 $83,099 Implemented