IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

443

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0310 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $335 $75 n/a
TT0310 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $7,227 $9,500 n/a
TT0310 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,799 $60 n/a
TT0310 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $6,590 $2,200 n/a
TT0310 # 02 Y:2024 02 2024 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,414 $17,000 n/a
TT0310 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,939 $3,600 n/a
TT0310 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $9,068 $12,500 n/a
TT0290 # 01 Y:2023 01 2023 UPGRADE OBSOLETE EQUIPMENT $106,623 $200,000 Implemented
TT0290 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,477 $10,500 Not Implemented
TT0290 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $911 $30 Implemented
TT0290 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $1,150 Implemented
TT0290 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $21,000 $2,000 Not Implemented
TT0290 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,755 Implemented
TT0286 # 08 Y:2023 08 2023 AIR CONDITION ONLY SPACE NECESSARY $2,551 $3,200 Implemented
TT0286 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,352 $3,450 Implemented
TT0286 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,768 $37,360 Not Implemented
TT0286 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,747 $1,210 Implemented
TT0286 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $12,412 $17,500 Implemented
TT0286 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $15,688 $1,229 Not Implemented
TT0286 # 03 Y:2023 03 2023 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $15,950 $900 Implemented
TT0286 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $32,010 $18,000 Implemented
TT0282 # 01 Y:2022 01 2022 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $816,618 $2,873,364 Implemented
TT0282 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $360,908 $51,360 Implemented
TT0282 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,725 $152,000 Implemented
TT0282 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,363 $21,260 Implemented