IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0639 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,727 $25,000 Not Implemented
NC0639 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,235 $31,057 Not Implemented
NC0639 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $103,705 $500 Not Implemented
UF0534 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $53,586 $333,760 Not Implemented
UF0534 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,685 $27,820 Not Implemented
UF0534 # 03 Y:2019 03 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $8,399 $570 Not Implemented
UF0534 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,018 $0 Not Implemented
UF0534 # 05 Y:2019 05 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,000 $18,400 Not Implemented
IP0125 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,774 $150 Not Implemented
IP0125 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,180 $354 Implemented
IP0125 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $932 $315 Implemented
IP0125 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $908 $1,344 Implemented
IP0125 # 05 Y:2019 05 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $269 $500 Implemented
IP0125 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,324 $8,560 Implemented
IP0125 # 07 Y:2019 07 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $2,364 $6,720 Implemented
IP0125 # 08 Y:2019 08 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $133 $390 Implemented
GT0930 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $11,220 $2,763 Implemented
GT0930 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,062 $3,500 Implemented
GT0930 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,531 $8,066 Implemented
GT0930 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $479 $463 Implemented
GT0930 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,746 $1,755 Implemented
GT0930 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,093 $2,092 Not Implemented
GT0930 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,081 $2,100 Implemented
GT0930 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $3,500 Implemented
GT0930 # 09 Y:2019 09 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $37,647 $154,353 Not Implemented