Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,785
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0207 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,736 | $7,996 | Not Implemented |
GT0918 # 01 Y:2018 | 01 | 2018 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,016 | $1,488 | Implemented |
GT0918 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,414 | $3,500 | Implemented |
GT0918 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,373 | $5,449 | Implemented |
GT0918 # 04 Y:2018 | 04 | 2018 | AVOID FROST FORMATION ON EVAPORATORS | $47,297 | $90,000 | Not Implemented |
GT0918 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM TEMPERATURE | $8,768 | $23,162 | Not Implemented |
GT0918 # 06 Y:2018 | 06 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $232 | $1,000 | Implemented |
GT0918 # 07 Y:2018 | 07 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,630 | $13,862 | Not Implemented |
LS1812 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,387 | $50 | Not Implemented |
LS1812 # 02 Y:2018 | 02 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,980 | $20,000 | Not Implemented |
LS1812 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,886 | $17,000 | Implemented |
LS1812 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,243 | $13,500 | Not Implemented |
IP0107 # 01 Y:2018 | 01 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,310 | $596 | Implemented |
IP0107 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,840 | $3,587 | Implemented |
IP0107 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $629 | $1,485 | Not Implemented |
IP0107 # 04 Y:2018 | 04 | 2018 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $957 | $2,201 | Implemented |
IP0107 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,646 | $9,560 | Implemented |
IP0107 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,610 | $7,858 | Implemented |
IP0107 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,878 | $39,406 | Implemented |
IP0107 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $582 | $2,219 | Implemented |
IP0107 # 09 Y:2018 | 09 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,691 | $85,000 | Implemented |
LS1810 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $358 | $25 | Not Implemented |
LS1810 # 02 Y:2018 | 02 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $880 | $340 | Implemented |
LS1810 # 03 Y:2018 | 03 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $650 | $650 | Not Implemented |
LS1810 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $986 | $1,088 | Implemented |