IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0013 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $733 $0 Not Implemented
SJ0013 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,579 $0 Not Implemented
SJ0013 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $22 Not Implemented
SJ0013 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,399 $1,473 Not Implemented
SJ0013 # 09 Y:2024 09 2024 COMBINE UTILITY METERS $454 $0 Not Implemented
AS0567 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,430 $774,239 Implemented
AS0567 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $86,125 $165,996 Not Implemented
AS0567 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $57,803 $10,720 Not Implemented
AS0567 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,255 $31,926 Not Implemented
AS0567 # 05 Y:2023 05 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $647 $384 Not Implemented
SF0613 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,003 $100 n/a
SF0613 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,636 $2,272 n/a
SF0613 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $16,386 $2,278 n/a
SF0613 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,117 $3,083 n/a
SF0613 # 05 Y:2024 05 2024 INSULATE FEEDWATER TANK $1,576 $1,977 n/a
SF0613 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,170 n/a
SF0613 # 07 Y:2024 07 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,789 $52,101 n/a
SF0613 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,505 $22,063 n/a
SF0613 # 09 Y:2024 09 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,729 $28,430 n/a
SF0613 # 10 Y:2024 10 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $141,513 $823,750 n/a
KS2324 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $63,860 $598,739 n/a
KS2324 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,738 $5,480 n/a
KS2324 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,201 $0 n/a
KS2324 # 04 Y:2023 04 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $12,787 $8,320 n/a
KS2324 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,344 $22,467 n/a