Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
445
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0193 # 07 Y:1993 | 07 | 1993 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,806 | $1,000 | Implemented |
OR0193 # 08 Y:1993 | 08 | 1993 | AIR CONDITION ONLY SPACE NECESSARY | $6,042 | $6,116 | Implemented |
OR0193 # 09 Y:1993 | 09 | 1993 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $18,099 | $39,000 | Implemented |
OR0125 # 01 Y:1991 | 01 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $18,739 | $0 | Implemented |
OR0125 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,392 | $6,072 | Implemented |
OR0125 # 03 Y:1991 | 03 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,391 | $35,042 | Implemented |
OR0125 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,743 | $0 | Implemented |
OR0125 # 05 Y:1991 | 05 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,934 | $83,040 | Implemented |
OR0044 # 01 Y:1988 | 01 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,498 | $0 | Implemented |
OR0044 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,775 | $500 | Implemented |
OR0044 # 03 Y:1988 | 03 | 1988 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,200 | $1,108 | Implemented |
OR0044 # 04 Y:1988 | 04 | 1988 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,512 | $676 | Implemented |
OR0044 # 05 Y:1988 | 05 | 1988 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,162 | $2,550 | Not Implemented |
OR0044 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $297 | $250 | Implemented |
OR0044 # 07 Y:1988 | 07 | 1988 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $10,545 | $0 | Not Implemented |
OR0044 # 08 Y:1988 | 08 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,958 | $1,911 | Implemented |
OR0044 # 09 Y:1988 | 09 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $280 | $275 | Not Implemented |
OR0044 # 10 Y:1988 | 10 | 1988 | OPTIMIZE PLANT POWER FACTOR | $14,889 | $19,500 | Not Implemented |
OR0044 # 11 Y:1988 | 11 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,525 | $3,063 | Implemented |
OR0045 # 01 Y:1988 | 01 | 1988 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $1,601 | $320 | Not Implemented |
OR0045 # 02 Y:1988 | 02 | 1988 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $614 | $513 | Not Implemented |
OR0045 # 03 Y:1988 | 03 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $61 | $64 | Not Implemented |
OR0045 # 04 Y:1988 | 04 | 1988 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,612 | $5,792 | Not Implemented |
OR0045 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,758 | $8,921 | Implemented |
OR0045 # 06 Y:1988 | 06 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,542 | $3,258 | Not Implemented |