IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

509

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0173 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,001 $9,164 Implemented
SU0173 # 07 Y:2004 07 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,555 $48,418 Not Implemented
SU0164 # 01 Y:2003 01 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $141,258 $1,171,875 Not Implemented
SU0164 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $115,419 $348,540 Implemented
SU0164 # 03 Y:2003 03 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $30,000 $76,518 Not Implemented
SU0164 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,096 $55,580 Implemented
SU0164 # 05 Y:2003 05 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,721 $0 Implemented
SU0164 # 06 Y:2003 06 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $7,910 $10,000 Not Implemented
SU0164 # 07 Y:2003 07 2003 REDESIGN PROCESS $6,861 $270 Implemented
SU0164 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,485 $700 Implemented
SU0164 # 09 Y:2003 09 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $1,293 $955 Implemented
SU0164 # 10 Y:2003 10 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $847 $1,744 Implemented
SU0164 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $723 $608 Implemented
SU0164 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $550 $0 Implemented
SU0164 # 13 Y:2003 13 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $29 Implemented
SU0164 # 14 Y:2003 14 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $198 $150 Not Implemented
SU0148 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $163,907 $767,895 Not Implemented
SU0148 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $25,533 $0 Implemented
SU0148 # 03 Y:2002 03 2002 $14,400 $20,000 Implemented
SU0148 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $31,584 $17,490 Implemented
SU0148 # 05 Y:2002 05 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,006 $3,700 Implemented
SU0148 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,438 $320 Not Implemented
SU0148 # 07 Y:2002 07 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $105 $0 Implemented
SU0148 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $70 $60 Implemented
SU0145 # 01 Y:2002 01 2002 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $50,000 $250,000 Not Implemented