IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0364 # 06 Y:2008 06 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $85,730 $61,250 Implemented
SF0364 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,557 $10,440 Not Implemented
SF0364 # 08 Y:2008 08 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,316 $22,812 Not Implemented
SF0364 # 09 Y:2008 09 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $9,060 $11,740 Implemented
SF0364 # 10 Y:2008 10 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $6,734 $8,900 Implemented
SF0364 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $409 $801 Implemented
SF0364 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,909 $2,854 Implemented
SF0364 # 13 Y:2008 13 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,296 $2,489 Implemented
SF0364 # 14 Y:2008 14 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,306 $125,074 Implemented
UW0017 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $338 $2,199 Not Implemented
UW0017 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $982 Implemented
UW0017 # 01 Y:2008 01 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,732 $17,259 Not Implemented
UW0016 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,638 $0 Implemented
UW0016 # 02 Y:2008 02 2008 REPLACE BOILER $10,000 $20,000 Not Implemented
UW0016 # 03 Y:2008 03 2008 REPAIR OR REPLACE STEAM TRAPS $5,490 $5,600 Not Implemented
UW0016 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $7,000 $500 Implemented
UW0016 # 05 Y:2008 05 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,625 $8,550 Implemented
UW0016 # 06 Y:2008 06 2008 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,510 $10 Not Implemented
UW0016 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $892 $0 Not Implemented
UW0013 # 04 Y:2008 04 2008 USE SOLAR HEAT FOR HEAT $1,498 $4,250 Not Implemented
UW0013 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Implemented
UW0013 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $522 $1,787 Not Implemented
UW0013 # 03 Y:2008 03 2008 UPGRADE OBSOLETE EQUIPMENT $1,913 $6,000 Not Implemented
UW0013 # 02 Y:2008 02 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,365 $130 Not Implemented
UW0013 # 01 Y:2008 01 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $3,676 $593 Not Implemented