IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

722

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0342 # 15 Y:2006 15 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,938 $0 Not Implemented
WV0342 # 16 Y:2006 16 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,240 $93 Not Implemented
WV0342 # 17 Y:2006 17 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,975 $2,344 Implemented
LL0248 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,816 $14,656 Not Implemented
LL0248 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,463 $1,022 Implemented
LL0248 # 03 Y:2006 03 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,218 $80 Implemented
LL0248 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,082 $20 Implemented
LL0248 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $151 Implemented
LL0248 # 06 Y:2006 06 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $900 $300 Implemented
LL0248 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $150 Not Implemented
LL0248 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $320 $50 Not Implemented
OR0499 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $77,273 $12,000 Implemented
OR0499 # 02 Y:2006 02 2006 $30,000 $18,000 Implemented
OR0499 # 03 Y:2006 03 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,200 $0 Implemented
OR0499 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,900 $570 Implemented
OR0499 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,960 $3,700 Implemented
OR0499 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,700 $12,700 Implemented
OR0499 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,700 $5,700 Implemented
OR0499 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $2,950 $4,600 Not Implemented
OR0499 # 09 Y:2006 09 2006 UPGRADE CONTROLS ON COMPRESSORS $6,400 $19,000 Implemented
OR0499 # 10 Y:2006 10 2006 OPTIMIZE PLANT POWER FACTOR $2,460 $8,200 Implemented
MI0129 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,749 $400 Implemented
MI0129 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,075 $1,410 Implemented
MI0129 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,814 $1,074 Not Implemented
MI0129 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $314 $140 Not Implemented