IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

741

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0390 # 06 Y:1989 06 1989 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $14,480 $16,950 Not Implemented
GT0390 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $68,230 $29,500 Implemented
GT0390 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,700 $0 Implemented
GT0392 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,550 $0 Implemented
GT0392 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,803 $2,217 Implemented
GT0392 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,625 $0 Implemented
GT0392 # 04 Y:1989 04 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $650 $0 Not Implemented
GT0392 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $3,680 $2,110 Implemented
GT0392 # 06 Y:1989 06 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,490 $375 Implemented
GT0392 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,120 $1,220 Implemented
GT0392 # 08 Y:1989 08 1989 USE OPTIMUM THICKNESS INSULATION $14,830 $22,000 Not Implemented
GT0392 # 09 Y:1989 09 1989 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $41,430 $16,000 Implemented
GT0392 # 10 Y:1989 10 1989 RECOVER WASTE HEAT FROM EQUIPMENT $9,490 $27,500 Not Implemented
GT0392 # 11 Y:1989 11 1989 USE OPTIMUM THICKNESS INSULATION $740 $1,190 Not Implemented
GT0392 # 12 Y:1989 12 1989 REDUCE OR ELIMINATE WASTE $24,430 $0 Implemented
GT0394 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $109,711 $0 Implemented
GT0394 # 02 Y:1989 02 1989 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,141 $5,000 Not Implemented
GT0394 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,918 $6,340 Implemented
GT0394 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $647 $1,517 Implemented
GT0394 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $260 $1,060 Implemented
GT0394 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,109 $7,140 Implemented
GT0378 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $722 Implemented
GT0378 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $800 $160 Implemented
GT0378 # 03 Y:1989 03 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,940 $9,000 Implemented
GT0378 # 04 Y:1989 04 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $65 $40 Implemented