Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,706
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0417 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,199 | $100 | Implemented |
NC0417 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,220 | $2,500 | Not Implemented |
NC0417 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $739 | $180 | Not Implemented |
NC0417 # 05 Y:2010 | 05 | 2010 | ADOPT IN-HOUSE MATERIAL GENERATION | $26,671 | $70,000 | Not Implemented |
NC0417 # 06 Y:2010 | 06 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $2,928 | $1,000 | Not Implemented |
NC0417 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $168 | $199 | Not Implemented |
NC0417 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $2,865 | $2,751 | Not Implemented |
NC0417 # 09 Y:2010 | 09 | 2010 | USE PHOTOCELL CONTROLS | $417 | $122 | Not Implemented |
SD0502 # 01 Y:2010 | 01 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,800 | $10,000 | Implemented |
SD0502 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,170 | $1,000 | Implemented |
SD0502 # 03 Y:2010 | 03 | 2010 | INCREASE AMOUNT OF CONDENSATE RETURNED | $15,940 | $2,263 | Not Implemented |
SD0502 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,905 | $161,162 | Implemented |
OR0561 # 01 Y:2010 | 01 | 2010 | ISOLATE HOT OR COLD EQUIPMENT | $7,124 | $1,529 | Implemented |
OR0561 # 02 Y:2010 | 02 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $84,544 | $24,245 | Implemented |
OR0561 # 03 Y:2010 | 03 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $14,426 | $7,234 | Implemented |
OR0561 # 04 Y:2010 | 04 | 2010 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $18,820 | $19,635 | Implemented |
OR0561 # 05 Y:2010 | 05 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $90,831 | $106,316 | Implemented |
OR0561 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $10,046 | Implemented |
OR0561 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,321 | $3,321 | Implemented |
OR0560 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $68,119 | $26,207 | Not Implemented |
OR0560 # 02 Y:2010 | 02 | 2010 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $37,651 | $90,666 | Not Implemented |
OR0560 # 03 Y:2010 | 03 | 2010 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,047 | $0 | Not Implemented |
OR0560 # 04 Y:2010 | 04 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $11,768 | $0 | Not Implemented |
OR0560 # 05 Y:2010 | 05 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,400 | $7,001 | Not Implemented |
OR0560 # 06 Y:2010 | 06 | 2010 | OPTIMIZE PLANT POWER FACTOR | $11,450 | $23,156 | Not Implemented |