Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21,002
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0595 # 04 Y:2024 | 04 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $420 | $72 | n/a |
AS0595 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $44 | n/a |
AS0595 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $255 | $197 | n/a |
AS0595 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $132 | $254 | n/a |
UC2417 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $888 | $0 | n/a |
UC2417 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,644 | $9,173 | n/a |
UC2417 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,989 | $7,146 | n/a |
UC2417 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,301 | $75 | n/a |
UC2417 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $5,554 | $1,050 | n/a |
UC2417 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,329 | $0 | n/a |
UU0264 # 01 Y:2025 | 01 | 2025 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $79,422 | $143,652 | n/a |
UU0264 # 02 Y:2025 | 02 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $215,672 | $730,950 | n/a |
UU0264 # 11 Y:2025 | 11 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,506 | $432,000 | n/a |
UU0264 # 03 Y:2025 | 03 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $729,671 | $3,645,455 | n/a |
UU0264 # 04 Y:2025 | 04 | 2025 | REPLACE BOILER | $379,077 | $4,080,441 | n/a |
UU0264 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,332 | $4,000 | n/a |
UU0264 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,905 | $7,317 | n/a |
UU0264 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,405 | $8,915 | n/a |
UU0264 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $538 | $1,531 | n/a |
UU0264 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,517 | $717,537 | n/a |
UU0264 # 10 Y:2025 | 10 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $916 | n/a |
WM0231 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $952 | $900 | n/a |
WM0231 # 05 Y:2025 | 05 | 2025 | REPLACE BOILER | $1,068 | $1,150 | n/a |
WM0231 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,105 | $0 | n/a |
WM0231 # 03 Y:2025 | 03 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,383 | $1,500 | n/a |