IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0113 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,030 $18,354 Implemented
DL0111 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,454 $17,500 Not Implemented
DL0111 # 02 Y:2013 02 2013 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $5,281 $1,500 Implemented
DL0111 # 03 Y:2013 03 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,423 $45,640 Not Implemented
DL0111 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,668 $25,000 Not Implemented
DL0111 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,667 $13,600 Not Implemented
DL0111 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $930 $50 Implemented
DL0111 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $20,400 $25,000 Implemented
DL0101 # 01 Y:2013 01 2013 CLOSE OFF UNNEEDED STEAM LINES $5,097 $225 Not Implemented
DL0101 # 02 Y:2013 02 2013 USE OPTIMUM THICKNESS INSULATION $7,200 $432 Not Implemented
DL0101 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $51,000 $130,000 Not Implemented
DL0101 # 04 Y:2013 04 2013 REPLACE BOILER $16,867 $28,062 Not Implemented
DL0101 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $3,500 Not Implemented
DL0101 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $19,110 Not Implemented
DL0101 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,100 $22,500 Not Implemented
DL0101 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,800 $0 Not Implemented
DL0081 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $323,076 $500,000 Not Implemented
DL0081 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,870 $24,400 Implemented
DL0081 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,801 $36,000 Implemented
DL0081 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,818 $54,000 Implemented
DL0081 # 05 Y:2012 05 2012 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $18,222 $42,000 Not Implemented
DL0081 # 06 Y:2012 06 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,850 $4,500 Not Implemented
DL0081 # 07 Y:2012 07 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,257 $28,000 Not Implemented
DL0081 # 08 Y:2012 08 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $16,536 $8,900 Not Implemented
DL0081 # 09 Y:2012 09 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,536 $25,000 Not Implemented