Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
334
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1012 # 08 Y:2020 | 08 | 2020 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $46,434 | $0 | Not Implemented |
UD1012 # 07 Y:2020 | 07 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $49,540 | $21,295 | Implemented |
UD1012 # 06 Y:2020 | 06 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $67,773 | $0 | Implemented |
UD1012 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,521 | $1,000 | Not Implemented |
UD1012 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,440 | $0 | Not Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |
UD1012 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,706 | $0 | Not Implemented |
UD1012 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,380 | $400 | Not Implemented |
IC0231 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $15,040 | $26,145 | Implemented |
IC0231 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,285 | $6,673 | Implemented |
IC0231 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,211 | $50,440 | Implemented |
IC0231 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,061 | $2,400 | Not Implemented |
IC0231 # 05 Y:2020 | 05 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,416 | $0 | Implemented |
IP0130 # 04 Y:2020 | 04 | 2020 | OPTIMIZE PLANT POWER FACTOR | $41,119 | $18,096 | Not Implemented |
IP0130 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $547 | $0 | Not Implemented |
IP0130 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,064 | $70 | Implemented |
IP0130 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,236 | $208 | Implemented |
IP0130 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $539 | $348 | Not Implemented |
IP0130 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $967 | $1,966 | Implemented |
IP0130 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $537 | $396 | Implemented |
IP0125 # 08 Y:2019 | 08 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $133 | $390 | Implemented |
IP0125 # 07 Y:2019 | 07 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,364 | $6,720 | Implemented |
IP0125 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,324 | $8,560 | Implemented |
IP0125 # 05 Y:2019 | 05 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $269 | $500 | Implemented |
IP0125 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $908 | $1,344 | Implemented |