Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
445
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0130 # 06 Y:2019 | 06 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $28,587 | $13,000 | Not Implemented |
BS0124 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,766 | $6,213 | Not Implemented |
BS0124 # 02 Y:2019 | 02 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $392 | $1,259 | Not Implemented |
BS0124 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,609 | $1,030 | Not Implemented |
BS0124 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,460 | $2,200 | Not Implemented |
BS0118 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,275 | $20 | Not Implemented |
BS0118 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $616 | $960 | Not Implemented |
BS0118 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $257 | $30 | Not Implemented |
BS0118 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $1,313 | $760 | Not Implemented |
BS0118 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $821 | $275 | Not Implemented |
BS0118 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $545 | $210 | Not Implemented |
BS0118 # 07 Y:2019 | 07 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,186 | $790 | Not Implemented |
BS0117 # 01 Y:2019 | 01 | 2019 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $32,085 | $5,600 | Not Implemented |
BS0117 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $413 | $1,047 | Not Implemented |
BS0117 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,373 | $350 | Not Implemented |
BS0117 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,573 | $1,650 | Not Implemented |
BS0117 # 05 Y:2019 | 05 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $3,322 | $502 | Not Implemented |
OR0712 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $200,991 | $689,600 | Implemented |
OR0712 # 02 Y:2018 | 02 | 2018 | REPLACE BOILER | $56,825 | $365,566 | Not Implemented |
OR0712 # 03 Y:2018 | 03 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $33,804 | $25,271 | Not Implemented |
OR0712 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,006 | $21,662 | Not Implemented |
OR0712 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $17,619 | $17,511 | Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
BS0079 # 01 Y:2016 | 01 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,545 | $6,216 | Not Implemented |
BS0079 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $154 | $148 | Implemented |