Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21,135
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0412 # 07 Y:2008 | 07 | 2008 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $2,081 | $534 | Not Implemented |
UF0412 # 08 Y:2008 | 08 | 2008 | INSTALL SET-BACK TIMERS | $15,103 | $4,916 | Implemented |
UF0412 # 09 Y:2008 | 09 | 2008 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,822 | $10,480 | Implemented |
UF0412 # 10 Y:2008 | 10 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $95,676 | $20,000 | Not Implemented |
UF0412 # 11 Y:2008 | 11 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,359 | $4,246 | Implemented |
UW0016 # 01 Y:2008 | 01 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,638 | $0 | Implemented |
UW0016 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $10,000 | $20,000 | Not Implemented |
UW0016 # 03 Y:2008 | 03 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $5,490 | $5,600 | Not Implemented |
UW0016 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $7,000 | $500 | Implemented |
UW0016 # 05 Y:2008 | 05 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,625 | $8,550 | Implemented |
UW0016 # 06 Y:2008 | 06 | 2008 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $5,510 | $10 | Not Implemented |
UW0016 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $892 | $0 | Not Implemented |
UW0013 # 01 Y:2008 | 01 | 2008 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $3,676 | $593 | Not Implemented |
UW0013 # 02 Y:2008 | 02 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,365 | $130 | Not Implemented |
UW0013 # 03 Y:2008 | 03 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $1,913 | $6,000 | Not Implemented |
UW0013 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT FOR HEAT | $1,498 | $4,250 | Not Implemented |
UW0013 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $544 | $0 | Implemented |
UW0013 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $522 | $1,787 | Not Implemented |
UA0021 # 01 Y:2008 | 01 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $12,169 | $6,000 | Not Implemented |
UA0021 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,811 | $2,000 | Implemented |
UA0021 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,288 | $3,000 | Implemented |
UA0021 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,835 | $0 | Implemented |
UA0021 # 05 Y:2008 | 05 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,804 | $8,000 | Not Implemented |
UA0021 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,292 | $2,550 | Not Implemented |
UA0021 # 07 Y:2008 | 07 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $6,002 | $986 | Implemented |