Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,706
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0746 # 12 Y:2007 | 12 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,000 | $840,000 | Not Implemented |
LE0253 # 10 Y:2007 | 10 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,672 | $2,500 | Not Implemented |
LE0253 # 11 Y:2007 | 11 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,980 | $510 | Not Implemented |
LE0253 # 12 Y:2007 | 12 | 2007 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $60,000 | $100,000 | Not Implemented |
LE0253 # 01 Y:2007 | 01 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $41,910 | $32,000 | Implemented |
LE0253 # 02 Y:2007 | 02 | 2007 | ELIMINATE/REDUCE AN OPERATION | $40,620 | $4,000 | Not Implemented |
LE0253 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,542 | $300 | Implemented |
LE0253 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $20,904 | $300 | Implemented |
LE0253 # 05 Y:2007 | 05 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $20,819 | $37,000 | Implemented |
LE0253 # 06 Y:2007 | 06 | 2007 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $12,436 | $15,000 | Not Implemented |
LE0253 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,186 | $1,000 | Implemented |
LE0253 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,349 | $6,200 | Implemented |
LE0253 # 09 Y:2007 | 09 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $8,342 | $480 | Not Implemented |
SF0342 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $250,944 | $80,000 | Not Implemented |
SF0342 # 02 Y:2007 | 02 | 2007 | AVOID FROST FORMATION ON EVAPORATORS | $86,147 | $41,628 | Not Implemented |
SF0342 # 03 Y:2007 | 03 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $8,746 | $7,500 | Implemented |
SF0342 # 04 Y:2007 | 04 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,598 | $1,412 | Not Implemented |
SF0342 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,282 | $34,413 | Not Implemented |
SF0342 # 06 Y:2007 | 06 | 2007 | INSTALL OCCUPANCY SENSORS | $17,040 | $25,438 | Not Implemented |
SF0342 # 07 Y:2007 | 07 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,176 | $22,780 | Implemented |
SF0342 # 08 Y:2007 | 08 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $130,413 | $250,000 | Not Implemented |
SF0342 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,865 | $13,500 | Not Implemented |
SF0342 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,677 | $54,912 | Implemented |
SF0342 # 11 Y:2007 | 11 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,536 | $5,000 | Not Implemented |
AM0529 # 01 Y:2007 | 01 | 2007 | INSTALL HYDROGEN FUEL CELL | $59,020 | $250,000 | Not Implemented |