IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0098 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $1,000 Implemented
UU0098 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $410 $2,880 Implemented
UU0098 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $2,380 $2,040 Implemented
SF0321 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,975 $0 Implemented
SF0321 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,657 $0 Implemented
SF0321 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,882 $0 Implemented
SF0321 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,112 $863 Not Implemented
SF0321 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,189 $1,561 Implemented
SF0321 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,410 $2,345 Not Implemented
SF0321 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $554 $780 Implemented
SF0321 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,550 $25,410 Implemented
SF0321 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,170 $11,928 Implemented
IA0380 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $25 Implemented
IA0380 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $215 Implemented
IA0380 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $262 $879 Implemented
IA0380 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $8,142 Not Implemented
IA0380 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,037 $1,906 Not Implemented
IA0380 # 06 Y:2006 06 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,632 $4,000 Not Implemented
IA0380 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $298 $650 Not Implemented
IA0380 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,020 $29,000 Not Implemented
WI0506 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,973 $16,740 Implemented
WI0506 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,049 $0 Implemented
WI0506 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,464 $0 Not Implemented
WI0506 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,464 $1,000 Implemented
WI0506 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $800 Implemented