IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0290 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $21,000 $2,000 Not Implemented
TT0290 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,477 $10,500 Not Implemented
TT0290 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,755 Implemented
TT0290 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $911 $30 Implemented
TT0290 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $523 $1,150 Implemented
LE0543 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $839 $100 Implemented
LE0543 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,597 $3,000 Not Implemented
LE0543 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,298 $8,400 Implemented
LE0543 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $210 $760 Implemented
LE0543 # 05 Y:2023 05 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,200 $9,000 Implemented
LE0543 # 06 Y:2023 06 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,075 $13,169 Implemented
UF0591 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $460,292 $1,330,000 Not Implemented
UF0591 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $48,128 $44,635 Implemented
UF0591 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,481 $66,747 Implemented
UF0591 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,896 $8,591 Implemented
UF0591 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $12,470 $19,320 Implemented
UF0591 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $2,168 $8,880 Implemented
UF0591 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,713 $0 Implemented
UF0591 # 08 Y:2023 08 2023 INSTALL TURBULATORS $1,724 $7,500 Not Implemented
GT0964 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $78,169 $1,850 Implemented
GT0964 # 02 Y:2023 02 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $142,026 $175,000 Not Implemented
GT0964 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,849 $36,015 Not Implemented
GT0964 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,786 $50,570 Implemented
GT0964 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,788 $8,500 Not Implemented
CM1016 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $2,957 $0 n/a