Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0293 # 10 Y:2002 10 2002 RECOVER AND REUSE WASTE MATERIAL $83,104 $400,000 n/a
UF0293 # 11 Y:2002 11 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $642 $1,895 n/a
UF0293 # 12 Y:2002 12 2002 METER WASTE WATER $5,209 $1,700 n/a
UF0293 # 13 Y:2002 13 2002 EXPAND OPERATIONS INTO UNUSED SPACE $40,000 $4,838 n/a
UF0293 # 14 Y:2002 14 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $133,295 $97,500 n/a
UF0293 # 15 Y:2002 15 2002 CHANGE OPERATING CONDITIONS $4,941 $5,000 n/a
UF0293 # 16 Y:2002 16 2002 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $2,808 $864 n/a
UF0293 # 17 Y:2002 17 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $10,000 $752 n/a
AS0294 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $2,070 Implemented
AS0294 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,366 $6,076 Implemented
AS0294 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,492 $15,000 Implemented
AS0294 # 04 Y:2001 04 2001 INSTALL SKYLIGHTS $1,527 $3,086 Not Implemented
OK0634 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $2,496 $823 Implemented
OK0634 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $2,910 $4,125 Implemented
OK0634 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,571 $6,000 Not Implemented
OK0634 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $218 $255 Implemented
OK0634 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $532 $282 Not Implemented
OK0634 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $1,679 Implemented
OK0634 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $216 $2,500 Not Implemented
OK0634 # 08 Y:2002 08 2002 UPGRADE CONTROLS ON COMPRESSORS $7,297 $1,028 Implemented
OK0634 # 09 Y:2002 09 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,476 $1,800 Not Implemented
OK0634 # 10 Y:2002 10 2002 REPAIR OR REPLACE STEAM TRAPS $33,934 $525 Implemented
UF0291 # 01 Y:2002 01 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,755 $1,050 Implemented
UF0291 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,427 $192 Not Implemented
UF0291 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,917 $6,752 Implemented