IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0289 # 08 Y:2001 08 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $9,660 $4,612 Implemented
OK0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,798 $913 Not Implemented
OK0615 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,895 $5,476 Implemented
OK0615 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,844 $585 Implemented
OK0615 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $3,788 $250 Implemented
OK0615 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,147 $238 Not Implemented
OK0615 # 06 Y:2001 06 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,998 $6,000 Not Implemented
OK0615 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $536 $163 Implemented
OK0615 # 08 Y:2001 08 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $20,688 $8,572 Not Implemented
OK0615 # 09 Y:2001 09 2001 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $13,745 $240 Implemented
OK0615 # 10 Y:2001 10 2001 REPLACE BOILER $7,761 $22,000 Not Implemented
UF0288 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,662 $6,465 Not Implemented
UF0288 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,358 $500 Implemented
UF0288 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,443 $30,000 Not Implemented
UF0288 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,155 $0 Implemented
UF0288 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $800 $2,000 Not Implemented
UF0288 # 06 Y:2001 06 2001 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $720,000 $559,440 Not Implemented
UF0288 # 07 Y:2001 07 2001 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $169,000 $176,000 Implemented
UF0288 # 08 Y:2001 08 2001 INSTALL BACK-UP EQUIPMENT $29,400 $64,000 Implemented
CO0495 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,590 $17,000 Implemented
CO0495 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,860 $500 Implemented
CO0495 # 03 Y:2001 03 2001 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $470 $500 Implemented
CO0495 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $0 Implemented
CO0495 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,900 $1,000 Implemented
LL0123 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,416 $1,740 Implemented