Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,706
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0251 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $863 | $220 | Implemented |
UF0251 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $616 | $0 | Implemented |
UF0251 # 06 Y:2000 | 06 | 2000 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $44,000 | $3,034 | Implemented |
UF0251 # 07 Y:2000 | 07 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $940 | $0 | Not Implemented |
UF0251 # 08 Y:2000 | 08 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $378 | $0 | Implemented |
UF0251 # 09 Y:2000 | 09 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $418 | $280 | Implemented |
UF0251 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $104,000 | $110,000 | Not Implemented |
OR0364 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $8,700 | $600 | Implemented |
OR0364 # 02 Y:2000 | 02 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $57,110 | $38,980 | Not Implemented |
OR0364 # 03 Y:2000 | 03 | 2000 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $7,011 | $12,500 | Not Implemented |
KU0539 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $163,360 | $135,000 | Not Implemented |
KU0539 # 02 Y:2000 | 02 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,700 | $30,000 | Not Implemented |
KU0539 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM TEMPERATURE | $15,700 | $20,000 | Implemented |
KU0539 # 04 Y:2000 | 04 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,800 | $0 | Not Implemented |
KU0539 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $9,070 | $5,750 | Not Implemented |
KU0539 # 06 Y:2000 | 06 | 2000 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $77,640 | $85,000 | Not Implemented |
UD0595 # 01 Y:2000 | 01 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $330,000 | $0 | Not Implemented |
UD0595 # 02 Y:2000 | 02 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $96,096 | $106,000 | Not Implemented |
UD0595 # 03 Y:2000 | 03 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $14,451 | $5,000 | Not Implemented |
UD0595 # 04 Y:2000 | 04 | 2000 | REDUCE SCRAP PRODUCTION | $11,016 | $20,400 | Not Implemented |
UD0595 # 05 Y:2000 | 05 | 2000 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,851 | $2,000 | Not Implemented |
UD0595 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $846 | Not Implemented |
SF0190 # 01 Y:2000 | 01 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,188 | $0 | Implemented |
SF0190 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,105 | $0 | Implemented |
SF0190 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,740 | $0 | Implemented |