IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0251 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $220 Implemented
UF0251 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $616 $0 Implemented
UF0251 # 06 Y:2000 06 2000 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $44,000 $3,034 Implemented
UF0251 # 07 Y:2000 07 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $940 $0 Not Implemented
UF0251 # 08 Y:2000 08 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $378 $0 Implemented
UF0251 # 09 Y:2000 09 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $418 $280 Implemented
UF0251 # 10 Y:2000 10 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $104,000 $110,000 Not Implemented
OR0364 # 01 Y:2000 01 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,700 $600 Implemented
OR0364 # 02 Y:2000 02 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $57,110 $38,980 Not Implemented
OR0364 # 03 Y:2000 03 2000 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $7,011 $12,500 Not Implemented
KU0539 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $163,360 $135,000 Not Implemented
KU0539 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $44,700 $30,000 Not Implemented
KU0539 # 03 Y:2000 03 2000 USE OPTIMUM TEMPERATURE $15,700 $20,000 Implemented
KU0539 # 04 Y:2000 04 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,800 $0 Not Implemented
KU0539 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,070 $5,750 Not Implemented
KU0539 # 06 Y:2000 06 2000 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $77,640 $85,000 Not Implemented
UD0595 # 01 Y:2000 01 2000 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $330,000 $0 Not Implemented
UD0595 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,096 $106,000 Not Implemented
UD0595 # 03 Y:2000 03 2000 CONDENSE OPERATION INTO ONE BUILDING $14,451 $5,000 Not Implemented
UD0595 # 04 Y:2000 04 2000 REDUCE SCRAP PRODUCTION $11,016 $20,400 Not Implemented
UD0595 # 05 Y:2000 05 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,851 $2,000 Not Implemented
UD0595 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $846 Not Implemented
SF0190 # 01 Y:2000 01 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,188 $0 Implemented
SF0190 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $2,105 $0 Implemented
SF0190 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,740 $0 Implemented