IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

587

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0415 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,722 $6,274 Implemented
IA0415 # 05 Y:2007 05 2007 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,262 $1,500 Implemented
IA0415 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $525 $635 Implemented
IA0415 # 09 Y:2007 09 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,560 $740 Implemented
IA0415 # 10 Y:2007 10 2007 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $2,038 $2,236 Implemented
IA0415 # 11 Y:2007 11 2007 INSULATE BARE EQUIPMENT $2,180 $1,563 Not Implemented
IA0415 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,867 $3,329 Implemented
IA0403 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,368 $14,768 Implemented
IA0403 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,814 $12,468 Implemented
IA0403 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $400 Implemented
IA0403 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,132 $25 Implemented
IA0403 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $948 $100 Not Implemented
IA0403 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $984 $750 Implemented
IA0396 # 06 Y:2006 06 2006 HEAT WATER WITH EXHAUST HEAT $57,298 $18,000 Not Implemented
IA0396 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $781 $25 Not Implemented
IA0396 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,228 $600 Implemented
IA0396 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $3,899 Implemented
IA0396 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,836 $4,661 Implemented
IA0396 # 07 Y:2006 07 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,338 $500 Implemented
IA0396 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $810 $83 Implemented
IA0396 # 09 Y:2006 09 2006 USE MINIMUM STEAM OPERATING PRESSURE $2,109 $25 Not Implemented
IA0396 # 08 Y:2006 08 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,234 $1,702 Implemented
IA0384 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,970 $1,000 Implemented
IA0384 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,278 $924 Not Implemented
IA0384 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $735 Implemented