IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0184 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,128 $6,420 Not Implemented
SF0184 # 08 Y:2000 08 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,696 $850 Not Implemented
SF0184 # 09 Y:2000 09 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $63,815 $35,960 Not Implemented
SF0184 # 10 Y:2000 10 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $43,395 $130,000 Not Implemented
SD0237 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,985 $88,000 Implemented
SD0237 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,408 $2,800 Implemented
SD0237 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $688 $100 Implemented
SD0237 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,766 $9,903 Not Implemented
SD0237 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $4,525 $6,910 Not Implemented
SD0237 # 06 Y:2000 06 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,740 $8,500 Not Implemented
SD0237 # 07 Y:2000 07 2000 MINIMIZE WATER USAGE $646 $100 Implemented
SD0237 # 08 Y:2000 08 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $40,972 $7,200 Implemented
SD0237 # 09 Y:2000 09 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $20,236 $26,000 Not Implemented
OD0150 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $9,564 Not Implemented
OD0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $370 $400 Not Implemented
OD0150 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $20 Not Implemented
OD0150 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $3,660 Not Implemented
OD0150 # 05 Y:1999 05 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $779 $0 Not Implemented
TN0650 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $150,000 $30,000 Not Implemented
TN0650 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,400 $0 Implemented
TN0650 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,150 $0 Implemented
TN0650 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $6,220 $2,180 Not Implemented
TN0650 # 05 Y:1999 05 1999 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,350 $36,000 Not Implemented
TN0650 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,960 $16,600 Not Implemented
TN0650 # 07 Y:1999 07 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $39,640 $30,500 Not Implemented