Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,706
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0184 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,128 | $6,420 | Not Implemented |
SF0184 # 08 Y:2000 | 08 | 2000 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,696 | $850 | Not Implemented |
SF0184 # 09 Y:2000 | 09 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $63,815 | $35,960 | Not Implemented |
SF0184 # 10 Y:2000 | 10 | 2000 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $43,395 | $130,000 | Not Implemented |
SD0237 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,985 | $88,000 | Implemented |
SD0237 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,408 | $2,800 | Implemented |
SD0237 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $688 | $100 | Implemented |
SD0237 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,766 | $9,903 | Not Implemented |
SD0237 # 05 Y:2000 | 05 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,525 | $6,910 | Not Implemented |
SD0237 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,740 | $8,500 | Not Implemented |
SD0237 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $646 | $100 | Implemented |
SD0237 # 08 Y:2000 | 08 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,972 | $7,200 | Implemented |
SD0237 # 09 Y:2000 | 09 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $20,236 | $26,000 | Not Implemented |
OD0150 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,354 | $9,564 | Not Implemented |
OD0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $400 | Not Implemented |
OD0150 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $20 | Not Implemented |
OD0150 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $611 | $3,660 | Not Implemented |
OD0150 # 05 Y:1999 | 05 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $779 | $0 | Not Implemented |
TN0650 # 01 Y:1999 | 01 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $150,000 | $30,000 | Not Implemented |
TN0650 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,400 | $0 | Implemented |
TN0650 # 03 Y:1999 | 03 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $8,150 | $0 | Implemented |
TN0650 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $6,220 | $2,180 | Not Implemented |
TN0650 # 05 Y:1999 | 05 | 1999 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $6,350 | $36,000 | Not Implemented |
TN0650 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,960 | $16,600 | Not Implemented |
TN0650 # 07 Y:1999 | 07 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $39,640 | $30,500 | Not Implemented |