IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0152 # 08 Y:2000 08 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $452 $1,000 Not Implemented
OD0151 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $855 $487 Not Implemented
OD0151 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $45 $95 Not Implemented
OD0151 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $194 $100 Not Implemented
OD0151 # 04 Y:2000 04 2000 INSTALL SKYLIGHTS $106 $180 Not Implemented
OD0151 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,229 $1,815 Not Implemented
OD0151 # 06 Y:2000 06 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $180 $725 Not Implemented
TP0010 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,563 $3,724 n/a
TP0010 # 02 Y:2000 02 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,633 $2,612 n/a
TP0010 # 03 Y:2000 03 2000 USE SYNTHETIC LUBRICANT $1,314 $0 n/a
TP0010 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $874 n/a
TP0010 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $660 $415 n/a
TP0010 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $428 $450 n/a
TP0010 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $173 $267 n/a
TP0010 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $111 $0 n/a
UD0586 # 01 Y:2000 01 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $454,896 $340,000 Not Implemented
UD0586 # 02 Y:2000 02 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $99,635 $350,000 Not Implemented
UD0586 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,665 $5,000 Not Implemented
UD0586 # 04 Y:2000 04 2000 MINIMIZE WATER USAGE $18,654 $298 Implemented
UD0586 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,183 $0 Implemented
UD0586 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,583 $0 Not Implemented
IA0238 # 01 Y:2000 01 2000 INSTALL STEAM TRAP $1,500 $628 Implemented
IA0238 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,337 $6,470 Not Implemented
IA0238 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $363 Not Implemented
IA0238 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $485 $195 Not Implemented