IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,699

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0086 # 07 Y:1997 07 1997 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $8,845 $4,800 Implemented
NV0086 # 08 Y:1997 08 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $34,460 $12,000 Implemented
NV0086 # 09 Y:1997 09 1997 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $41,700 $650 Not Implemented
NV0086 # 10 Y:1997 10 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $390 $300 Implemented
SF0123 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,567 $25,020 Not Implemented
SF0123 # 02 Y:1997 02 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $8,269 $19,750 Not Implemented
SF0123 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,606 $1,680 Not Implemented
SF0123 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $1,784 $3,010 Not Implemented
SF0123 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,656 $204 Not Implemented
SF0123 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $790 $0 Not Implemented
SF0123 # 07 Y:1997 07 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,226 $175 Not Implemented
SF0123 # 08 Y:1997 08 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,233 $2,490 Not Implemented
SF0123 # 09 Y:1997 09 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $4,893 $0 Not Implemented
SF0123 # 10 Y:1997 10 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $24,394 $250 Not Implemented
SF0123 # 11 Y:1997 11 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $21,040 $11,500 Not Implemented
SF0123 # 12 Y:1997 12 1997 UTILIZE OUTSIDE CONTRACTING $54,074 $250 Not Implemented
OR0304 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,502 $0 Implemented
OR0304 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $1,070 $3,200 Not Implemented
OR0304 # 03 Y:1997 03 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,530 $0 Implemented
OR0304 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $450 $500 Implemented
OR0304 # 05 Y:1997 05 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,881 $1,560 Not Implemented
OR0304 # 06 Y:1997 06 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,300 $0 Implemented
OR0304 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,988 $5,910 Implemented
OR0304 # 08 Y:1997 08 1997 MINIMIZE WATER USAGE $4,000 $0 Not Implemented
OR0304 # 09 Y:1997 09 1997 RECOVER AND REUSE WASTE MATERIAL $0 $250 Not Implemented