Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,699
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0139 # 02 Y:1996 | 02 | 1996 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $18,648 | $0 | Implemented |
UF0139 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,180 | $11,068 | Not Implemented |
UF0139 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,372 | $57,360 | Not Implemented |
UF0139 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,506 | $350 | Implemented |
UF0139 # 06 Y:1996 | 06 | 1996 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,271 | $35,000 | Not Implemented |
UF0139 # 07 Y:1996 | 07 | 1996 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,581 | $1,125 | Not Implemented |
UF0139 # 08 Y:1996 | 08 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,118 | $10,800 | Not Implemented |
UF0139 # 09 Y:1996 | 09 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $7,200 | $0 | Not Implemented |
AM0261 # 01 Y:1996 | 01 | 1996 | BURN A LESS EXPENSIVE GRADE OF FUEL | $40,374 | $40,400 | Implemented |
AM0261 # 02 Y:1996 | 02 | 1996 | OPTIMIZE PLANT POWER FACTOR | $9,900 | $25,000 | Not Implemented |
AM0261 # 03 Y:1996 | 03 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,000 | $1,300 | Implemented |
AM0261 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,100 | $1,000 | Implemented |
AM0261 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $960 | $1,020 | Not Implemented |
AM0261 # 06 Y:1996 | 06 | 1996 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $970 | $810 | Implemented |
AM0261 # 07 Y:1996 | 07 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $617 | $260 | Implemented |
AM0261 # 08 Y:1996 | 08 | 1996 | ELIMINATE/REDUCE AN OPERATION | $677 | $1,030 | Not Implemented |
KG0048 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,326 | $21,750 | Implemented |
KG0048 # 02 Y:1996 | 02 | 1996 | USE SYNTHETIC LUBRICANT | $2,934 | $0 | Not Implemented |
KG0048 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $900 | $20 | Implemented |
KG0048 # 04 Y:1996 | 04 | 1996 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $712 | $1,890 | Implemented |
KG0048 # 05 Y:1996 | 05 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $2,282 | $275 | Implemented |
KG0048 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,657 | $0 | Implemented |
KG0048 # 07 Y:1996 | 07 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $556 | $0 | Not Implemented |
OD0048 # 01 Y:1996 | 01 | 1996 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,211 | $13,391 | Not Implemented |
OD0048 # 02 Y:1996 | 02 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,112 | $1,077 | Not Implemented |