IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,699

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0068 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,833 $39,950 Implemented
AR0068 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,361 $0 Implemented
AR0068 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $150,834 $4,000 Implemented
AR0068 # 05 Y:1995 05 1995 REPAIR AND ELIMINATE STEAM LEAKS $17,600 $2,100 Implemented
AR0068 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,023 $250 Implemented
AR0068 # 07 Y:1995 07 1995 CHECK FOR ACCURACY OF UTILITY / POWER METERS $31,656 $5,000 Not Implemented
AR0068 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $3,519 $500 Implemented
SF0070 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $602 $610 Implemented
SF0070 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,041 $9,983 Not Implemented
SF0070 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $2,395 $4,330 Not Implemented
SF0070 # 04 Y:1995 04 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,535 $14,820 Implemented
SF0070 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,695 $1,918 Implemented
SF0070 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $421 $758 Implemented
SF0070 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,114 $40 Implemented
SF0070 # 08 Y:1995 08 1995 INSULATE FEEDWATER TANK $307 $702 Implemented
SF0070 # 09 Y:1995 09 1995 INCREASE AMOUNT OF CONDENSATE RETURNED $8,250 $1,620 Implemented
IA0125 # 01 Y:1995 01 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $38,625 $95,200 Not Implemented
IA0125 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,391 $1,567 Implemented
IA0125 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $22 Implemented
IA0125 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $175 Not Implemented
IA0125 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $267 $870 Not Implemented
IA0125 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $511 $1,743 Not Implemented
IA0125 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $499 $371 Implemented
IA0125 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $484 Not Implemented
IA0125 # 09 Y:1995 09 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $691 $500 Not Implemented