IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,689

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0019 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $388 Implemented
IA0019 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $16 Implemented
IA0019 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $212 $100 Not Implemented
OK0382 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $6,362 Implemented
OK0382 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $909 $606 Implemented
OK0382 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,333 $2,790 Implemented
OK0382 # 04 Y:1992 04 1992 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $12,447 $29,926 Implemented
OK0382 # 05 Y:1992 05 1992 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $20,707 $66,000 Not Implemented
OK0382 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $372 $2,263 Implemented
OK0378 # 01 Y:1992 01 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,528 $700 Not Implemented
OK0378 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,435 $3,500 Implemented
OK0378 # 03 Y:1992 03 1992 HEAT WATER WITH EXHAUST HEAT $8,382 $270 Implemented
OK0378 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,156 $3,125 Not Implemented
OK0378 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $2,553 $2,183 Implemented
OK0378 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $70 $0 Not Implemented
OK0378 # 07 Y:1992 07 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,948 $8,560 Not Implemented
OK0375 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $0 Implemented
OK0375 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,925 $0 Implemented
OK0375 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $3,604 $505 Not Implemented
OK0375 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,338 $0 Implemented
AM0152 # 01 Y:1992 01 1992 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $23,665 $13,890 Not Implemented
AM0152 # 02 Y:1992 02 1992 OPERATE BOILERS ON HIGH FIRE SETTING $6,790 $6,500 Not Implemented
AM0152 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,300 $5,610 Not Implemented
AM0152 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,770 $400 Not Implemented
AM0152 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,400 $0 Not Implemented