IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0323 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,360 $6,000 Implemented
LE0323 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,240 $542 Not Implemented
LE0323 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $2,921 Implemented
LE0323 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $778 $0 Implemented
UM0392 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,168 $54,459 Implemented
UM0392 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $9,765 $5,250 Implemented
UM0392 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,083 $500 Not Implemented
UM0392 # 04 Y:2011 04 2011 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,205 $130 Not Implemented
UM0392 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $781 $1,000 Not Implemented
UM0392 # 06 Y:2011 06 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,528 $66,561 Not Implemented
UM0392 # 07 Y:2011 07 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $10,240 $13,740 Not Implemented
UM0392 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $630 $1,000 Implemented
UM0392 # 09 Y:2011 09 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $33,030 $37,825 Not Implemented
GT0884 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,890 $44,900 Implemented
GT0884 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $4,290 $210 Implemented
GT0884 # 03 Y:2011 03 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $57,100 $361,600 Not Implemented
GT0884 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $600 Implemented
GT0884 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,610 $14,000 Not Implemented
GT0884 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $43,550 Not Implemented
GT0884 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,550 $2,000 Implemented
GT0884 # 08 Y:2011 08 2011 UPGRADE CONTROLS ON COMPRESSORS $31,010 $160,650 Not Implemented
GT0884 # 09 Y:2011 09 2011 OPTIMIZE PLANT POWER FACTOR $6,584 $37,790 Not Implemented
DL0072 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $282,000 $500,000 Not Implemented
DL0072 # 02 Y:2011 02 2011 OPERATE BOILERS ON HIGH FIRE SETTING $136,800 $100,000 Not Implemented
DL0072 # 03 Y:2011 03 2011 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,600 $5,000 Not Implemented