Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,647

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0244 # 08 Y:2002 08 2002 REDUCE EXCESSIVE BOILER BLOWDOWN $6,671 $6,000 Implemented
SF0244 # 09 Y:2002 09 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,672 $2,500 Not Implemented
SF0244 # 10 Y:2002 10 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $319 $393 Not Implemented
SF0244 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,487 $14,055 Not Implemented
SF0244 # 12 Y:2002 12 2002 TREAT AND REUSE RINSE WATERS $218,183 $18,705 n/a
SF0244 # 13 Y:2002 13 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,739 $0 Not Implemented
SF0244 # 14 Y:2002 14 2002 OPTIMIZE PLANT POWER FACTOR $2,389 $3,651 Not Implemented
SF0244 # 15 Y:2002 15 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $72,375 $160,000 Not Implemented
SF0244 # 16 Y:2002 16 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $101,519 $350,000 Implemented
SD0307 # 01 Y:2002 01 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $115,174 $476,400 Not Implemented
SD0307 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,963 $18,000 Not Implemented
SD0307 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,517 $2,500 Not Implemented
SD0307 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $933 $1,200 Not Implemented
SD0307 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $785 $0 Not Implemented
SD0307 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,134 $5,000 Not Implemented
SD0295 # 01 Y:2002 01 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $9,645 $200 Not Implemented
SD0295 # 02 Y:2002 02 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,840 $0 Not Implemented
SD0295 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,967 $0 Not Implemented
SD0295 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $1,578 $1,000 Implemented
SD0295 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,373 $3,000 Not Implemented
SD0295 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $543 $1,200 Not Implemented
SD0295 # 07 Y:2002 07 2002 RECOVER AND REUSE WASTE MATERIAL $198,000 $15,000 Not Implemented
SD0295 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $416,352 $655,000 Implemented
SD0295 # 09 Y:2002 09 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $5,965 $3,500 Not Implemented
LM0036 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203,445 $95,480 Implemented