Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product organic tortilla chips and taco shells
NAICS 311919 - Other Snack Food Manufacturing
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 50,000
Annual Production 13,000,000 Pounds
Production Hrs. Annual 8,640
Location (State)
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $248,050 2,021,190 kWh $0.12
Electricity Demand $36,013 4,380 kW-months/year $8.22
Electricity Fees $26,557 - $ -
Natural Gas $213,486 51,202 MMBtu $4.17
TOTAL ENERGY COSTS $524,106
RECOMMENDED SAVINGS* $321,856 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $158,656
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,243
Cost:
$1,760
$2,053 15,828 $190 22 - - - - $2,053
15,828
kWh
$190
22
kW-months/year
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,478
Cost:
$1,466
$3,184 24,545 $294 34 - - - - $3,184
24,545
kWh
$294
34
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$510
Cost:
$210
$896 7,506 $134 11 $(-520) - - - $896
7,506
kWh
$134
11
kW-months/year
$(-520)
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$192
Cost:
$150
$192 1,609 - - - - - - $192
1,609
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$7,233
Cost:
$3,600
$6,622 51,048 $611 71 - - - - $6,622
51,048
kWh
$611
71
kW-months/year
-
-
$
-
-
$
06: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$145,000
Cost:
$38,029
- - - - - - $145,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$145,000
-
$
07: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$163,200
Cost:
$19,584
- - - - - - $163,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$163,200
-
$
TOTAL RECOMMENDED Savings:
$321,856
Cost:
$64,799
$12,947 100,536 $1,229 138 $(-520) - $308,200 - $12,947
100,536
kWh
$1,229
138
kW-months/year
$(-520)
-
$
$308,200
-
$
TOTAL IMPLEMENTED Savings:
$158,656
Cost:
$45,215
$12,947 100,536 $1,229 138 $(-520) - $145,000 - $12,947
100,536
kWh
$1,229
138
kW-months/year
$(-520)
-
$
$145,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes