IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,647

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0036 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,227 $1,335 Implemented
LM0036 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,015 $550 Implemented
LM0036 # 04 Y:2002 04 2002 UPGRADE CONTROLS ON COMPRESSORS $19,570 $300 Not Implemented
LM0036 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,342 $4,800 Implemented
LM0036 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,928 $23,600 Not Implemented
LM0036 # 07 Y:2002 07 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,505 $21,928 Not Implemented
LM0036 # 08 Y:2002 08 2002 INSTALL SENSORS TO DETECT AND AVOID JAMS $101,250 $15,800 Implemented
LM0036 # 09 Y:2002 09 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $145,152 $2,000 Not Implemented
LM0036 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $202,078 $453,275 Not Implemented
LM0036 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $199,710 $14,000 Implemented
LM0036 # 12 Y:2002 12 2002 DEVELOP STANDARD OPERATING PROCEDURES $354,257 $45,500 Implemented
SD0294 # 01 Y:2002 01 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,512 $6,000 Not Implemented
SD0294 # 02 Y:2002 02 2002 ISOLATE HOT OR COLD EQUIPMENT $3,123 $5,200 Not Implemented
SD0294 # 03 Y:2002 03 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,969 $2,000 Not Implemented
SD0294 # 04 Y:2002 04 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $501 $20 Not Implemented
SD0294 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,904 $2,000 Implemented
LM0033 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $6,143 $10,400 Not Implemented
LM0033 # 02 Y:2002 02 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,578 $0 Not Implemented
LM0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,854 $370 Not Implemented
LM0033 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,073 $31,000 Not Implemented
LM0033 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $64,833 $96,800 Not Implemented
LM0033 # 06 Y:2002 06 2002 UTILIZE OUTSIDE CONTRACTING $22,623 $12,000 Not Implemented
LM0033 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $243,003 $208,000 Not Implemented
LM0033 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $237,812 $70,000 Not Implemented
LM0033 # 09 Y:2002 09 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $90,240 $34,800 Not Implemented