IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

366

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0172 # 06 Y:1999 06 1999 AVOID REWINDING MOTORS MORE THAN TWICE $10,026 $25,900 Not Implemented
NC0172 # 07 Y:1999 07 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $188 $300 Not Implemented
NC0172 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $2,627 $2,500 Not Implemented
NC0172 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $1,235 $1,200 Not Implemented
NC0110 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,602 $200 Implemented
NC0110 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $467 $240 Implemented
NC0110 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $363 $469 Implemented
NC0110 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,449 $1,160 Not Implemented
NC0110 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $101 $43 Not Implemented
NC0110 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $105 $109 Implemented
NC0110 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $840 Not Implemented
NC0110 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $422 Not Implemented
NC0110 # 09 Y:1997 09 1997 INSTALL OCCUPANCY SENSORS $497 $200 Not Implemented
NC0110 # 10 Y:1997 10 1997 RECOVER WASTE HEAT FROM EQUIPMENT $8,640 $30,000 Not Implemented
NC0110 # 11 Y:1997 11 1997 REDUCE SCRAP PRODUCTION $41,809 $30,000 Implemented
NC0110 # 12 Y:1997 12 1997 USE LESS WASTEFUL PACKAGING $15,804 $100 Not Implemented
NC0110 # 13 Y:1997 13 1997 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $8,370 $100 Not Implemented
NC0110 # 14 Y:1997 14 1997 LEASE EQUIPMENT INSTEAD OF PURCHASING $7,402 $1,000 Not Implemented
NC0102 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,712 $4,725 Not Implemented
NC0102 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $2,500 Implemented
NC0102 # 03 Y:1996 03 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,399 $2,500 Not Implemented
NC0102 # 04 Y:1996 04 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,100 $700 Implemented
NC0102 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,369 $30 Not Implemented
NC0102 # 06 Y:1996 06 1996 USE OTHER WASTE CONCENTRATION METHODS $3,239 $5,000 Implemented
NC0102 # 07 Y:1996 07 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $36,217 $30,000 Not Implemented