IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

490

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0025 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,571 $0 Not Implemented
ND0025 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $409 $300 Implemented
ND0025 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140 $250 Implemented
AM0156 # 01 Y:1992 01 1992 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,260 $0 Not Implemented
AM0156 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $10,125 $1,500 Implemented
AM0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,117 $3,200 Implemented
AM0156 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $860 Implemented
AM0156 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $2,900 $0 Implemented
AM0156 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $1,430 $0 Not Implemented
AS0057 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $41,691 $235,000 Not Implemented
AS0057 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,343 $0 Not Implemented
AS0057 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,703 $18,211 Not Implemented
AS0057 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,613 $0 Not Implemented
AS0057 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $300 Not Implemented
AS0057 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $2,000 $3,276 Not Implemented
AS0057 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $3,210 Not Implemented
AS0057 # 08 Y:1992 08 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $989 $200 Not Implemented
AS0057 # 09 Y:1992 09 1992 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,775 $6,535 Not Implemented
IA0019 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,255 $25,797 Implemented
IA0019 # 02 Y:1992 02 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,230 $500 Not Implemented
IA0019 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $388 Implemented
IA0019 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $16 Implemented
IA0019 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $212 $100 Not Implemented
KU0372 # 01 Y:1992 01 1992 USE MULTIPLE-EFFECT EVAPORATORS $133,326 $720,000 Not Implemented
KU0372 # 02 Y:1992 02 1992 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $91,322 $0 Not Implemented