IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1016 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,210 $730 Not Implemented
OK1016 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,028 $28,358 Implemented
OK1016 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,766 $9,480 Not Implemented
OK1016 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,330 $0 Implemented
OK1016 # 05 Y:2019 05 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,523 $0 Not Implemented
OK1016 # 06 Y:2019 06 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $885 $4,860 Not Implemented
OK1016 # 07 Y:2019 07 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $485 $636 Implemented
MI0360 # 01 Y:2019 01 2019 USE SOLAR HEAT TO HEAT WATER $36,147 $40,234 Implemented
MI0360 # 02 Y:2019 02 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $34,382 $15,720 Not Implemented
MI0360 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $9,735 $3,600 Implemented
MI0360 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $5,613 $13,630 Implemented
MI0360 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,707 $3,634 Implemented
MI0360 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $3,023 Implemented
MI0360 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,445 $1,980 Implemented
MI0360 # 08 Y:2019 08 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,675 $3,764 Implemented
MI0360 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $751 $211 Implemented
MI0360 # 10 Y:2019 10 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $684 $100 Not Implemented
MI0360 # 11 Y:2019 11 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $476 $868 Implemented
SF0546 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,375 $542 Implemented
SF0546 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,228 $705 Not Implemented
SF0546 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,458 $28,920 Not Implemented
SF0546 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $17,331 $84,932 Not Implemented
UF0534 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $53,586 $333,760 Not Implemented
UF0534 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,685 $27,820 Not Implemented
UF0534 # 03 Y:2019 03 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $8,399 $570 Not Implemented