Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0627 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $609 | $2,640 | Not Implemented |
AM0627 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $1,384 | $520 | Not Implemented |
AM0627 # 03 Y:2012 | 03 | 2012 | USE SYNTHETIC LUBRICANT | $2,906 | $0 | Not Implemented |
AM0627 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,546 | $980 | Implemented |
AM0627 # 01 Y:2012 | 01 | 2012 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $66,393 | $99,038 | Not Implemented |
OK0835 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,937 | $1,000 | Implemented |
OK0835 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,139 | $33,990 | Not Implemented |
OK0835 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,902 | $19,520 | Not Implemented |
OK0835 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $5,126 | Not Implemented |
OK0835 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $538 | $3,183 | Implemented |
OK0835 # 03 Y:2012 | 03 | 2012 | REPLACE BOILER | $10,532 | $96,000 | Not Implemented |
OK0835 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,644 | $17,103 | Not Implemented |
OK0835 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,445 | $1,500 | Implemented |
OK0835 # 14 Y:2012 | 14 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $987 | $240 | Not Implemented |
OK0835 # 11 Y:2012 | 11 | 2012 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $621 | $120 | Implemented |
OK0835 # 13 Y:2012 | 13 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,840 | $4,000 | Not Implemented |
OK0835 # 12 Y:2012 | 12 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $31,425 | $0 | Implemented |
OK0835 # 08 Y:2012 | 08 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,097 | $24,155 | Not Implemented |
OK0835 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,068 | $1,288 | Not Implemented |
AM0620 # 11 Y:2012 | 11 | 2012 | USE SYNTHETIC LUBRICANT | $515 | $0 | Not Implemented |
AM0620 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $1,030 | $1,650 | Implemented |
AM0620 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $3,290 | Implemented |
AM0620 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $750 | Not Implemented |
AM0620 # 04 Y:2012 | 04 | 2012 | REPLACE BOILER | $5,730 | $30,000 | Implemented |
AM0620 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,660 | $120 | Implemented |