Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
472
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0627 # 03 Y:2012 | 03 | 2012 | USE SYNTHETIC LUBRICANT | $2,906 | $0 | Not Implemented |
AM0627 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,546 | $980 | Implemented |
AM0627 # 01 Y:2012 | 01 | 2012 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $66,393 | $99,038 | Not Implemented |
AM0627 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $1,384 | $520 | Not Implemented |
AM0627 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $609 | $2,640 | Not Implemented |
OR0599 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,422 | $0 | Not Implemented |
OR0599 # 02 Y:2012 | 02 | 2012 | INSTALL AUTOMATIC PACKING EQUIPMENT | $35,308 | $0 | Implemented |
OR0599 # 04 Y:2012 | 04 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,409 | $0 | Implemented |
OR0599 # 05 Y:2012 | 05 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,964 | $17,576 | Not Implemented |
OR0599 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,611 | $12,467 | Implemented |
BS0010 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $70 | $60 | Not Implemented |
MAS032 # 02 Y:2012 | 02 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,141 | $8,000 | Not Implemented |
BS0010 # 01 Y:2012 | 01 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $289 | $630 | Not Implemented |
BS0010 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $222 | $512 | Implemented |
BS0010 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,826 | $750 | Not Implemented |
BS0010 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $645 | $251 | Implemented |
MAS032 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,230 | $20,000 | Not Implemented |
MAS032 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $256 | $400 | Implemented |
MAS032 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $8,920 | $8,000 | Not Implemented |
MAS032 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,897 | $38,000 | Not Implemented |
MAS032 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $1,008 | $730 | Not Implemented |
SF0423 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $4,512 | $0 | Implemented |
SF0423 # 04 Y:2012 | 04 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $5,375 | $3,925 | Implemented |
SF0423 # 01 Y:2012 | 01 | 2012 | CLOSE OFF UNNEEDED STEAM LINES | $417 | $0 | Implemented |
SF0423 # 03 Y:2012 | 03 | 2012 | INSTALL SET-BACK TIMERS | $3,656 | $0 | Implemented |