IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

472

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0627 # 03 Y:2012 03 2012 USE SYNTHETIC LUBRICANT $2,906 $0 Not Implemented
AM0627 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,546 $980 Implemented
AM0627 # 01 Y:2012 01 2012 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $66,393 $99,038 Not Implemented
AM0627 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $1,384 $520 Not Implemented
AM0627 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $609 $2,640 Not Implemented
OR0599 # 03 Y:2012 03 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,422 $0 Not Implemented
OR0599 # 02 Y:2012 02 2012 INSTALL AUTOMATIC PACKING EQUIPMENT $35,308 $0 Implemented
OR0599 # 04 Y:2012 04 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,409 $0 Implemented
OR0599 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $1,964 $17,576 Not Implemented
OR0599 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,611 $12,467 Implemented
BS0010 # 05 Y:2012 05 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $70 $60 Not Implemented
MAS032 # 02 Y:2012 02 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,141 $8,000 Not Implemented
BS0010 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $289 $630 Not Implemented
BS0010 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $222 $512 Implemented
BS0010 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,826 $750 Not Implemented
BS0010 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $251 Implemented
MAS032 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,230 $20,000 Not Implemented
MAS032 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $256 $400 Implemented
MAS032 # 01 Y:2012 01 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $8,920 $8,000 Not Implemented
MAS032 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,897 $38,000 Not Implemented
MAS032 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $1,008 $730 Not Implemented
SF0423 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,512 $0 Implemented
SF0423 # 04 Y:2012 04 2012 REPAIR OR REPLACE STEAM TRAPS $5,375 $3,925 Implemented
SF0423 # 01 Y:2012 01 2012 CLOSE OFF UNNEEDED STEAM LINES $417 $0 Implemented
SF0423 # 03 Y:2012 03 2012 INSTALL SET-BACK TIMERS $3,656 $0 Implemented