Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
1,408
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0345 # 02 Y:2018 | 02 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,837 | $3,204 | Implemented |
MI0345 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,969 | $3,100 | Implemented |
BS0111 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $20 | Implemented |
BS0111 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,250 | $60 | Implemented |
BS0111 # 04 Y:2018 | 04 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $10,878 | $1,225 | Implemented |
BS0111 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,707 | $2,970 | Implemented |
BS0111 # 02 Y:2018 | 02 | 2018 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $768 | $1,485 | Implemented |
BS0111 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,853 | $2,250 | Implemented |
UA0195 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,429 | $11,536 | Implemented |
UA0195 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,476 | $500 | Implemented |
UA0195 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,589 | $2,465 | Implemented |
MI0329 # 11 Y:2018 | 11 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $535 | $40 | Implemented |
MI0329 # 10 Y:2018 | 10 | 2018 | INSTALL OCCUPANCY SENSORS | $2,804 | $1,060 | Implemented |
MI0329 # 07 Y:2018 | 07 | 2018 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,580 | $460 | Implemented |
MI0329 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,257 | $10,017 | Implemented |
MI0329 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,453 | $2,520 | Implemented |
MI0329 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,950 | $1,660 | Implemented |
MI0329 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,609 | $40 | Implemented |
AM0747 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $12,800 | $39,100 | Implemented |
AM0747 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,900 | $44,160 | Implemented |
AM0747 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,800 | $121,500 | Implemented |
MZ0248 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,291 | $65,400 | Implemented |
MZ0248 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,015 | $1,988 | Implemented |
MZ0248 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,174 | $45,562 | Implemented |
UA0188 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,516 | $500 | Implemented |