Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1008 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,191 | $0 | Implemented |
UD1008 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $3,650 | Implemented |
UD1008 # 01 Y:2019 | 01 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,386 | $0 | Implemented |
UD1008 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,245 | $0 | Implemented |
UD1008 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,896 | $500 | Implemented |
UD1008 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,177 | $165,000 | Implemented |
UD1007 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,204 | $0 | Implemented |
UD1007 # 05 Y:2019 | 05 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,980 | $0 | Implemented |
UD1007 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,235 | $23,550 | Implemented |
UD0969 # 11 Y:2017 | 11 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,502 | $844 | Implemented |
UD0969 # 14 Y:2017 | 14 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,321 | $811 | Implemented |
UD0969 # 01 Y:2017 | 01 | 2017 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,613 | $30 | Implemented |
UD0969 # 02 Y:2017 | 02 | 2017 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $4,357 | $30 | Implemented |
UD0969 # 09 Y:2017 | 09 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,251 | $30 | Implemented |
UD0969 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,188 | $30 | Implemented |
UD0969 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,419 | $1,000 | Implemented |
UD0969 # 06 Y:2017 | 06 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $22,591 | $63,800 | Implemented |
UD0965 # 10 Y:2017 | 10 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $41,935 | $20,000 | Implemented |
UD0965 # 11 Y:2017 | 11 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $560 | $300 | Implemented |
UD0965 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,081 | $1,230 | Implemented |
UD0965 # 09 Y:2017 | 09 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,101 | $0 | Implemented |
UD0965 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,366 | $2,000 | Implemented |
UD0965 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,437 | $700 | Implemented |
UD0965 # 03 Y:2017 | 03 | 2017 | USE AUTOMATIC CLEANING EQUIPMENT | $15,770 | $0 | Implemented |
UD0899 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $2,127 | Implemented |