Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,939
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0188 # 02 Y:2018 | 02 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,707 | $7,500 | Not Implemented |
UA0188 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,552 | $64,329 | Not Implemented |
UA0188 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,516 | $500 | Implemented |
UA0188 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,745 | $2,465 | Implemented |
UA0188 # 06 Y:2018 | 06 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,389 | $737 | Implemented |
NC0601 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,641 | $200 | Implemented |
NC0601 # 02 Y:2017 | 02 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,840 | $750 | Not Implemented |
NC0601 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,606 | $100 | Not Implemented |
NC0601 # 04 Y:2017 | 04 | 2017 | KEEP BOILER TUBES CLEAN | $2,408 | $1,000 | Implemented |
NC0601 # 05 Y:2017 | 05 | 2017 | INSULATE FEEDWATER TANK | $792 | $750 | Not Implemented |
NC0601 # 06 Y:2017 | 06 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,825 | $82,000 | Not Implemented |
NC0601 # 07 Y:2017 | 07 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $21,773 | $20,000 | Not Implemented |
NC0601 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $217 | $487 | Not Implemented |
NC0601 # 09 Y:2017 | 09 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,876 | $30 | Not Implemented |
NL0007 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,200 | $77,400 | Not Implemented |
NL0007 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $47,300 | $5,400 | Implemented |
NL0007 # 03 Y:2017 | 03 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $36,200 | $1,700 | Implemented |
NL0007 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,300 | $67,600 | Implemented |
NL0007 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,000 | $3,100 | Not Implemented |
NL0007 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,250 | $12,000 | Implemented |
NL0007 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $2,700 | $840 | Implemented |
NC0596 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,879 | $54,333 | Not Implemented |
NC0596 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,718 | $100 | Implemented |
NC0596 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,579 | $200,000 | Not Implemented |
NC0596 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,012 | $39,000 | Not Implemented |