IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0914 # 16 Y:2015 16 2015 RECOVER WASTE HEAT FROM EQUIPMENT $64,892 $80,198 Not Implemented
OK0914 # 17 Y:2015 17 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $3,733 $703 Not Implemented
OK0914 # 18 Y:2015 18 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,019 $7,450 Not Implemented
OK0914 # 19 Y:2015 19 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $5,892 Not Implemented
OK0914 # 20 Y:2015 20 2015 OPTIMIZE PLANT POWER FACTOR $52,725 $154,000 Not Implemented
OK0914 # 21 Y:2015 21 2015 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,044 $1,832,665 Not Implemented
WM0059 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,912 $68,000 Not Implemented
WM0059 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,318 $17,000 Not Implemented
WM0059 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,435 $1,410 Not Implemented
WM0059 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,183 $77,150 Not Implemented
WM0059 # 05 Y:2014 05 2014 INSTALL EQUIPMENT TO MOVE PRODUCT $66,000 $172,000 Not Implemented
WM0059 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $36,422 $79,091 Not Implemented
WM0059 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,479 $1,560 Not Implemented
WM0059 # 08 Y:2014 08 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,568 $900 Not Implemented
WM0059 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,108 $0 Not Implemented
WM0059 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $122,690 $136,460 Not Implemented
WM0059 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,380 $2,700 Not Implemented
WM0059 # 12 Y:2014 12 2014 USE SYNTHETIC LUBRICANT $19,051 $3,070 Not Implemented
SD0490 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,150 $3,300 Implemented
SD0490 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,842 $5,480 Not Implemented
SD0490 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,773 $3,775 Implemented
SD0490 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,633 $500 Not Implemented
SD0490 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $730 $867 Not Implemented
SD0490 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $519 $1,550 Not Implemented
SD0490 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $440 $200 Implemented