IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0380 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $298 $650 Not Implemented
IA0380 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,020 $29,000 Not Implemented
IA0336 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,039 $7,405 Not Implemented
IA0336 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $906 $7,407 Not Implemented
IA0336 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,346 $1,197 Implemented
IA0336 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,139 $1,364 Implemented
IA0336 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $499 $400 Implemented
IA0336 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $199 $80 Implemented
IA0336 # 03 Y:2004 03 2004 REPLACE BOILER $27,684 $150,000 Implemented
IA0336 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,930 $20,000 Implemented
IA0336 # 01 Y:2004 01 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $3,854 $4,300 Implemented
IA0305 # 09 Y:2002 09 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,701 $592 Implemented
IA0305 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,638 $324 Implemented
IA0305 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,215 $184 Not Implemented
IA0305 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $517 $15 Not Implemented
IA0305 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,039 $10,736 Not Implemented
IA0305 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $0 Not Implemented
IA0305 # 07 Y:2002 07 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,521 $1,000 Not Implemented
IA0305 # 08 Y:2002 08 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $10,351 $18,000 Not Implemented
IA0305 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,721 $0 Implemented
IA0305 # 10 Y:2002 10 2002 REPAIR AND ELIMINATE STEAM LEAKS $1,890 $200 Implemented
IA0294 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,464 $1,663 Not Implemented
IA0294 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,482 $0 Implemented
IA0294 # 04 Y:2002 04 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,463 $0 Not Implemented
IA0294 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $581 Implemented