IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0664 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $25,051 $34,000 Not Implemented
MA0664 # 04 Y:2010 04 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,890 $95,000 Not Implemented
MA0664 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,874 $18,345 Not Implemented
MA0664 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,084 $200 Implemented
OK0789 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $80,818 $182,391 Not Implemented
OK0789 # 02 Y:2010 02 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,004 $15,450 Not Implemented
OK0789 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,970 $31,888 Implemented
OK0789 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,476 $144,256 Not Implemented
OK0789 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $384 $1,579 Not Implemented
OK0789 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,798 $7,980 Implemented
OK0789 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,330 $17,280 Not Implemented
OK0789 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $827 $896 Implemented
OK0789 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $10,734 $5,136 Not Implemented
OK0789 # 10 Y:2010 10 2010 USE POWER DURING OFF-PEAK PERIODS $34,743 $99,978 Not Implemented
OK0789 # 11 Y:2010 11 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $997 $1,486 Implemented
MZ0035 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,568 $0 Not Implemented
MZ0035 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $567 $775 Not Implemented
MZ0035 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,477 $900 Not Implemented
MZ0035 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $568 $358 Not Implemented
MZ0035 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,887 $900 Not Implemented
MZ0035 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $9,395 $1,500 Not Implemented
IA0442 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $1,012 Not Implemented
IA0442 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $1,053 $1,195 Not Implemented
IA0442 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,623 $25 Implemented
IA0442 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,409 $1,149 Not Implemented