Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0293 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $133 $233 Not Implemented
AM0507 # 01 Y:2006 01 2006 COMBINE UTILITY METERS $71,000 $100,000 Implemented
AM0507 # 02 Y:2006 02 2006 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $37,900 $600 Implemented
AM0507 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,000 $51,000 Not Implemented
AM0507 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $13,750 $2,100 Implemented
AM0507 # 05 Y:2006 05 2006 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) $7,616 $25,000 Not Implemented
AM0507 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $9,000 $500 Implemented
AM0507 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $400 Implemented
AM0507 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,900 $9,900 Implemented
AM0507 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $1,620 Implemented
AM0507 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $733 $0 Implemented
AM0507 # 11 Y:2006 11 2006 USE PHOTOCELL CONTROLS $1,120 $100 Implemented
AM0507 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $215 Implemented
OK0726 # 01 Y:2006 01 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,838 $2,305 Not Implemented
OK0726 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,412 $13,554 Not Implemented
OK0726 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,127 $339 Not Implemented
OK0726 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,283 $32,000 Not Implemented
OK0726 # 05 Y:2006 05 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $18,769 $16,500 Not Implemented
OK0726 # 06 Y:2006 06 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $31,992 $32,500 Not Implemented
OK0726 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $55,348 $35,269 Not Implemented
OK0726 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,168 $8,723 Not Implemented
OK0726 # 09 Y:2006 09 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $579 $2,006 Not Implemented
OK0726 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,213 $331 Not Implemented
OK0726 # 11 Y:2006 11 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,188 $5,750 Not Implemented
OK0725 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $36,035 $14,223 Not Implemented