IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,939

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0725 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $1,143 $339 Not Implemented
OK0725 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $365 $437 Not Implemented
OK0725 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $29,580 $24,609 Not Implemented
OK0725 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,367 $27,265 Not Implemented
IA0380 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $25 Implemented
IA0380 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $215 Implemented
IA0380 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $262 $879 Implemented
IA0380 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $8,142 Not Implemented
IA0380 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,037 $1,906 Not Implemented
IA0380 # 06 Y:2006 06 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,632 $4,000 Not Implemented
IA0380 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $298 $650 Not Implemented
IA0380 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,020 $29,000 Not Implemented
UU0093 # 01 Y:2005 01 2005 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $336,460 $336,000 Not Implemented
UU0093 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $727 $495 Not Implemented
UU0093 # 03 Y:2005 03 2005 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $350 $2,000 Not Implemented
UU0093 # 04 Y:2005 04 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,080 $0 Not Implemented
UU0093 # 05 Y:2005 05 2005 PAY UTILITY BILLS ON TIME $1,418 $0 Not Implemented
UU0093 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $777 $2,000 Not Implemented
LL0236 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,322 $4,300 Implemented
LL0236 # 02 Y:2005 02 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,274 $9,000 Implemented
LL0236 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $3,312 $500 Implemented
LL0236 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $772 $0 Not Implemented
LL0236 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $300 Implemented
LL0236 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $295 $100 Implemented
LL0236 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,780 $0 Not Implemented