IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0262 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,281 $564 Not Implemented
SF0262 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,464 $5,555 Implemented
SF0262 # 05 Y:2003 05 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,013 $2,748 Implemented
SF0262 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $355 $360 Not Implemented
SF0262 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $2,530 $3,638 Implemented
SF0262 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,502 $19,608 Not Implemented
SF0262 # 09 Y:2003 09 2003 REPLACE BOILER $39,608 $155,089 Not Implemented
SF0262 # 10 Y:2003 10 2003 RECOVER AND REUSE COOLING WATER $4,190 $6,871 Not Implemented
SF0178 # 01 Y:1999 01 1999 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,431 $0 Implemented
SF0178 # 02 Y:1999 02 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $850 $788 Implemented
SF0178 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $442 $600 Implemented
SF0178 # 04 Y:1999 04 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $6,772 $16,500 Not Implemented
SF0178 # 05 Y:1999 05 1999 USE PHOTOCELL CONTROLS $3,556 $14,000 Not Implemented
SF0178 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $240 $200 Implemented
SF0178 # 07 Y:1999 07 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,000 $200 Implemented
SF0178 # 08 Y:1999 08 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,184 $3,721 Not Implemented
SF0178 # 09 Y:1999 09 1999 TREAT AND REUSE RINSE WATERS $3,340 $3,269 Implemented
SF0178 # 10 Y:1999 10 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,484 $15,374 Not Implemented
SF0123 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,567 $25,020 Not Implemented
SF0123 # 02 Y:1997 02 1997 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $8,269 $19,750 Not Implemented
SF0123 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,606 $1,680 Not Implemented
SF0123 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $1,784 $3,010 Not Implemented
SF0123 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,656 $204 Not Implemented
SF0123 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $790 $0 Not Implemented
SF0123 # 07 Y:1997 07 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,226 $175 Not Implemented